Client: Dragon Steel
Location: Taiwan Taichung
Completion Time:
Type of Work: Raw material stacking field, reclaimer and stacker loading on upper track (1600M) and lower tracks (1600M)
Previous Page | Back | Next Page
Double-track Project for Chenggong Zhuifen Section of Taiwan Railway(Zaoqiao ~ Huatan)
Railway train-control safety improvement six-year plan(Western line drainage bridge reconstruction)
The Depot relocated from Kaohsiung to Chaozhou and the Development Plan of the Original Site
China Steel Corporation SCR Track Construction